A semiconductor assembly and test company (anonymised) · Eastern China · 2025-11

Building HAST capability at an OSAT
HAST condition
110 °C / 85 %RH / 0.4 MPa
PCT condition
121 °C / 100 %RH
Bias channels
32
Test duration
96 h per lot

Background

With a new QFN line starting, the customer needed HAST capability on site rather than at an external laboratory, where turnaround was measured in weeks and queue position was unpredictable. Bias had to be applied during the test, not just temperature and humidity.

Solution

A HAST-110 system for unsaturated steam at 110 °C, 85 %RH and 0.4 MPa, plus a PCT-121 for saturated-steam testing. Custom bias fixtures carry 32 channels to the devices under test, and the chamber interlock isolates bias on any pressure or temperature excursion.

Implementation and validation

Correlation runs against the external laboratory used the same lots and conditions. Results matched on all 12 reference lots, and repeatability across three runs stayed within the JESD22-A110 acceptance band.

Outcome

Moisture-reliability results now come back in days instead of weeks, so the new line qualified on schedule. The fixtures were designed so a second package family can be added without new tooling.

Equipment supplied
  • HAST-110
  • PCT-121
Standards applied
JESD22-A110JESD22-A118IEC 60068-2-66
Working on a similar programme? Send the standard and the specimen size and we will propose a configuration.
Request a quote

← All case studies